首页> 外文会议>International Conference on Measuring Technology and Mechatronics Automation >A multi-objective model about period train timetable problem and a genetic algorithm based on job-shop problem
【24h】

A multi-objective model about period train timetable problem and a genetic algorithm based on job-shop problem

机译:基于工作店问题的多目标模型及基于工作店问题的遗传算法

获取原文

摘要

At present, periodic train timetable problem (PTTP) becomes one of the hot topics home and abroad. On the basic of present theories and methods about periodic and non-periodic train timetable problem, the thesis constructs a multi-objectives model for the PTTP, transfers it into a single model with multi-priorities structure, and designs a genetic algorithm in a given period by the basic ideas on solving job shop problem. Finally, the paper gives out a instance for Jingjin railroad to show effectiveness of the algorithm.
机译:目前,定期列车时间表问题(PTTP)成为国内外热门主题之一。在关于周期性和非周期性列车时间表的基本理论和方法的基本上,论文构造了PTTP的多目标模型,将其传送到具有多优先级结构的单个模型,并在给定的遗传算法设计通过解决工作店问题的基本思想。最后,本文展示了京津铁路的实例,以显示算法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号