EXOMARS 2016 MISSION: AN OVERVIEW OF THE PHASE C ACTIVITIES PROGRESS

机译:2016年EXOMARS任务:阶段C活动进展概述

获取原文

摘要

The ExoMars Programme features two missions, one to be launched in January 2016 and one in April/May 2018. Hence for the 2016 mission ESA is procuring a large Spacecraft Composite consisting of a Trace Gas Orbiter (TGO) and an EDL Demonstrator Module (EDM). The Spacecraft Composite will be launched from Baikonur in January 2016 by a Proton Launcher, to arrive at Mars in mid-October of 2016. The 2016 mission industrial activities are now focused on the Phase C with the System-CDR planned to be completed by the end of the current year 2013. The EDM development is on schedule; in particular the EDM SM has been subjected to leak-tests in TAS-I to prove the tightness of the aeroshell. Sine and static have followed to demonstrate capability to withstand the launch and entry mechanical loads. The EDM functional qualification campaign has also started with software integration on the EDM Avionic Test Bench (ATB). The Wind Tunnel Test campaign has been completed and the Aero-Thermodynamic Data Base is now consolidated. The High Altitude Drop Test, to verify the parachute performances in a high altitude environment, is planned for completion by the end of 2013. At subsystem level the development tests of the Crushable Structure of the Landing Platform have been completed and the structure is ready for the final qualification tests planned in October this year. The TGO Mechanical Thermal & Propulsion (MTP) and Avionics Electronic and Radiofrequency (AER) PDR's were completed in the course of the year 2012. The phase C analyses campaign has started with the Guidance Navigation and Control (GNC) Robustness Analyses. The Central Software (CSW) and Satellite Database (SDB) development is being worked out in staggers (from V0 to V4) and the delivery of the first version for the start of AIT of the TGO ATB is planned at end of November this year. The 2.2 meter High Gain Antenna has entered the detailed analyses phase and its CDR is planned in Sept 2013. The TGO Harness Manufacturing Review has been held in Jan 2013 and the Delivery Review Boards (DRBs) of the three batches are scheduled in October and December of 2013 and March 2014, respectively. At MTP level the final structural, thermal and thermo-elastic analyses have been completed, testing activities on Central Tube (CT) Structural Model (SM) and Propulsion Engineering Verification Model (PEVM) were successfully closed in June and May 2013, while Thermal Engineering Verification Model (TEVM) ones are planned to be done in October 2013. The MTP CDR is now scheduled at the end of October 2013.
机译:ExoMars计划有两项任务,一项是在2016年1月发射,另一项是在2018年4月/ 5月发射。因此,对于2016年的任务,ESA正在采购由跟踪气体轨道器(TGO)和EDL演示器模块(EDM)组成的大型航天器组合。 )。复合材料航天器将由Proton发射器于2016年1月从拜科努尔发射,于2016年10月中旬抵达火星。2016年的任务工业活动现在集中在C阶段,计划由System-CDR完成EDM的开发工作已按计划在2013年年底完成。特别是EDM SM已在TAS-I中进行了泄漏测试,以证明机壳的密封性。正弦波和静态波随后证明了承受发射和进入机械载荷的能力。 EDM功能鉴定活动也从在EDM航空电子测试台(ATB)上进行软件集成开始。风洞测试活动已经完成,空气热力数据库现已合并。高空降落试验旨在验证降落伞在高空环境下的性能,计划于2013年底完成。在子系统级别,落地平台可破碎结构的开发测试已经完成,该结构已准备就绪最终的资格考试计划于今年10月进行。 TGO机械热与推进(MTP)和航空电子和射频(AER)PDR已于2012年完成。C期分析活动已从制导导航和控制(GNC)稳健性分析开始。中央软件(CSW)和卫星数据库(SDB)的开发工作正在分阶段进行(从V0到V4),并且计划在今年11月底交付用于TGO ATB的AIT启动的第一个版本。 2.2米高增益天线已进入详细分析阶段,其CDR计划于2013年9月进行。TGO线束制造审查已于2013年1月举行,三批交付审查委员会(DRB)计划于10月和12月进行。分别为2013年和2014年3月。在MTP级别上,完成了最终的结构,热和热弹性分析,有关中心管(CT)结构模型(SM)和推进工程验证模型(PEVM)的测试活动已于2013年6月和5月成功完成,而热工程验证模型(TEVM)的验证计划在2013年10月完成。MTPCDR现在计划在2013年10月结束。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号