首页> 外文会议>Annual International Bridge Conference >Application of GRS-IBS Bridge Design in Massachusetts
【24h】

Application of GRS-IBS Bridge Design in Massachusetts

机译:GRS-IBS桥梁设计在马萨诸塞州的应用

获取原文

摘要

As part of its ground-breaking Accelerated Bridge Program (ABP) legislation, the Massachusetts Department ofTransportation (MassDOT) is initiating several innovative bridge design and construction methods and techniques. Onesuch occurrence of the application of these techniques is in Sheffield, Massachusetts, where MassDOT will be constructing aGeosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS) bridge next year. GRS-IBS technology is one of the FederalHighway Administration (FHWA) Everyday Counts (EDC) initiatives.
机译:作为突破性的加速桥梁计划(ABP)立法的一部分,麻省 运输(MassDOT)正在启动几种创新的桥梁设计,建造方法和技术。一 这些技术的应用发生在马萨诸塞州谢菲尔德,MassDOT将在那里建造一个 明年,土工加筋土集成桥梁系统(GRS-IBS)桥梁。 GRS-IBS技术是联邦的一种 公路管理局(FHWA)日常工作(EDC)计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号