首页> 外文会议>Annual International Bridge Conference >Eggner’s Ferry Bridge: Innovative Approach to the Emergency Replacement of a Vital Crossing over Kentucky Lake
【24h】

Eggner’s Ferry Bridge: Innovative Approach to the Emergency Replacement of a Vital Crossing over Kentucky Lake

机译:艾格纳(Eggner)的轮渡桥:紧急更换生命湖上重要渡轮的创新方法

获取原文

摘要

The collision of a cargo ship with Eggner’s Ferry Bridge knocking out a 322 feet truss spans. This paperfocuses on the design strategy and opportunities to speed-up material procurement, simplifyfabrication and assembly. Accelerated construction techniques are also presented in this paper. TheEggner’s Ferry Bridge emergency replacement project that completed in 17 weeks is the benchmark forspeedy emergency repair and replacement of structures that are closed to traffic by accidents ordisasters.
机译:一艘货船与埃格纳的渡轮桥相撞,撞毁了322英尺的桁架跨度。这篇报告 专注于设计策略和加速材料采购,简化的机会 制造和组装。本文还介绍了加速施工技术。这 Eggner的渡轮桥紧急更换项目在17周内完成,是该项目的基准 迅速进行紧急维修和更换因事故或交通事故而无法通行的建筑物 灾难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号