首页> 外文会议>Annual International Bridge Conference >Milton Madison Bridge: Innovative Design Build Procurement to Accelerate the Replacement of a Vital River Crossing
【24h】

Milton Madison Bridge: Innovative Design Build Procurement to Accelerate the Replacement of a Vital River Crossing

机译:米尔顿·麦迪逊大桥(Milton Madison Bridge):创新设计建造采购,以加快重要河道的更换

获取原文

摘要

Across the country, hundreds of river crossings and other major structures are nearing the endof their useful service life or are functionally obsolete. Engineers and owners are increasinglyfacing the need to find innovate ways to replace or rehabilitate these structures in anenvironment of dwindling funding resources. The process described in this presentationdemonstrates strategies for accelerating project procurement and capitalizing on innovativeideas for accelerated reconstruction, including the re-use of existing substructures.
机译:在全国范围内,数百条河流过境点和其他主要建筑物已接近尾声 使用寿命或功能已过时。工程师和业主越来越多 面临寻找创新方法来替换或修复这些结构的需求 资金资源减少的环境。本演示文稿中描述的过程 展示加速项目采购和利用创新的策略 加快重建的构想,包括对现有子结构的重用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号