首页> 外文会议>World congress on intelligent transport systems >LRT- AND TRAMWAY PRIORITY IN THE COURSE OF 'GREEN WAVES' - A PLANNING METHOD TO INTEGRATE PUBLIC TRANSPORT INTO PROGRESSIVE SIGNAL SYSTEMS -
【24h】

LRT- AND TRAMWAY PRIORITY IN THE COURSE OF 'GREEN WAVES' - A PLANNING METHOD TO INTEGRATE PUBLIC TRANSPORT INTO PROGRESSIVE SIGNAL SYSTEMS -

机译:LRT-和电车轨道优先于“绿色波浪” - 将公共交通集成为渐进信号系统的规划方法 -

获取原文

摘要

LRT- and tramway lines, which are the backbone of public transport in many big German cities, normally run on separate tracks in the course of radials and ring roads of the urban primary road networks. As they are mostly part of coordinated signal systems adjusted to the requirements of general motor traffic, LRT-trains and tramways fall out of the green bands systematically with the consequence of considerable delays at the signalled at-grade intersections. The following report describes a software-based planning approach to determine coordination structures with minimum signal delays of public transport vehicles ("passive" priority), which form the basis for on-line adaptive priority control systems ("active" priority).
机译:LRT-和电车轨道线是许多大德国城市的公共交通的骨干,通常在城市主要道路网络的径向和环路路线上进行独立的轨道。由于它们主要是调整到通用电机交通的要求的协调信号系统的一部分,LRT-rain和Tramways系统地从绿色乐队系统地落下,所以通过信号的级交叉口的相当大的延迟。以下报告描述了一种基于软件的规划方法,可以确定具有公共交通工具的最小信号延迟的协调结构(“被动”优先级),这构成了在线自适应优先控制系统的基础(“有源”优先级)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号