首页> 外文会议>International conference on port and ocean engineering under arctic conditions >ICE-INDUCED VIBRATIONS OF OFFSHORE STRUCTURES - LOOKING BEYOND ISO 19906
【24h】

ICE-INDUCED VIBRATIONS OF OFFSHORE STRUCTURES - LOOKING BEYOND ISO 19906

机译:ICE引起的海上结构振动-超越ISO 19906

获取原文

摘要

The paper deals with the classical ice engineering challenge of ice-induced vibrations (IIV) of offshore platforms. There is still a general industry concern with aspects of IIV and the load amplification that can arise in some situations resulting from ice interaction with a structure. It was thought important to re-visit current design methodology and practice, as well as the data that led to their formulation. A joint industry project (JIP) was organized, in which the main offshore oil companies joined together to sponsor development and validation of models for ice induced vibration. Broadly, the JIP: ⅰ) identified interesting aspects of the mechanisms behind IIV; ⅱ) sponsored further development of three numerical modeling approaches chosen for the range of physics they captured; ⅲ) and, provided calibrated models to an independent engineering company who used them to assess the model's accuracy in simulating five full-scale events whose data had been withheld from the model developers - ensuring an independent validation rather than a further fitting of models to data. This paper is a "briefing" and provides an overview of the background, progress, and some validation findings: a status report on the reliability of present procedures available to the offshore industry when designing platforms in moving ice where IIV can be expected. The "science" behind the models will be presented by the model developers themselves (e.g. Hendrikse & Metrikine, 2013) and in further publications once the JIP confidentiality conditions expire.
机译:本文探讨了海上平台冰致振动(IIV)的经典制冰工程挑战。在某些情况下,由于冰与建筑物的相互作用而引起的IIV和负载放大仍是业界普遍关注的问题。重新访问当前的设计方法和实践以及导致其制定的数据被认为很重要。组织了一个联合工业项目(JIP),其中主要的海上石油公司共同赞助了冰激振模型的开发和验证。总体而言,JIP:ⅰ)确定了IIV背后机制的有趣方面; ⅱ)赞助了对三种数值建模方法的进一步开发,这些方法是针对它们捕获的物理范围而选择的; ⅲ),并将校准后的模型提供给一家独立的工程公司,该公司使用它们来评估模型的准确性,以模拟五个全规模事件,这些事件的数据已从模型开发者处撤出-确保进行独立验证,而不是进一步将模型拟合到数据中。本文是一个“简报”,概述了背景,进展和一些验证结果:一份状态报告,说明了在可预期使用IIV的移动冰上设计平台时,近海工业可利用的现有程序的可靠性。 JIP机密性条件到期后,模型开发人员自己(例如Hendrikse&Metrikine,2013年)将在模型背后提出“科学”,并在其他出版物中提出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号