首页> 外文会议>International conference on port and ocean engineering under arctic conditions >INFLUENCE OF MODELING FULL SCALE BASED MANAGED ICE CONDITIONS IN DP ICE MODEL TESTS
【24h】

INFLUENCE OF MODELING FULL SCALE BASED MANAGED ICE CONDITIONS IN DP ICE MODEL TESTS

机译:基于完全比例的可管理冰条件建模在DP ICE模型测试中的影响

获取原文

摘要

Recently there have been significant steps taken regarding the development of ice model testing capabilities for dynamic positioning (DP) operations in ice. Such developments have stemmed from the knowledge gained through involvement in real life DP operations in ice, namely the subsea construction operation with the CSO Constructor in the Sakhalin offshore in 1999, and the Arctic Coring Expedition with the icebreaker Vidar Viking near the North Pole in 2004. Lessons learned from these operations have lead to the conclusion that ice model testing for DP vessels in ice may require the need for a new approach to modeling ice conditions in order to achieve results that would start to approach real life experience. Two big steps have been taken that attempt to narrow the gap between model scale results and full scale expectations. First, a novel approach of starting to model ice such that the ice more closely resembles managed ice conditions that a DP vessel would be expected to operate in full scale was developed and applied in actual ice model tests. This will be the focus of this paper. Second, an actual DP system was installed on a model and tested in an ice model basin, to achieve a realistic level of behaviour of the model to match the real life operation as close as possible. Additional information on this topic can be found in Hals and Efraimsson (2011). These two developments constitute a major advancement in the development of dynamic positioning vessels and their DP systems in ice, and provide an approach to evaluate their operational capabilities.
机译:最近,在开发用于冰中动态定位(DP)操作的冰模型测试功能方面已采取了重要步骤。这种发展源于通过参与现实的DP冰上作业获得的知识,即1999年与萨哈林海上CSO建造商进行的海底建造作业,以及2004年在北极附近的破冰船Vidar Viking与北极取心探险队合作。从这些操作中学到的经验教训得出的结论是,对冰中DP船进行冰模型测试可能需要一种新的方法来对冰况进行建模,以便获得可以逼近实际生活的结果。已经采取了两个重要步骤,试图缩小模型规模结果与全面规模期望之间的差距。首先,开发了一种新颖的方法来开始对冰进行建模,以使冰更类似于管理型冰的条件,以至于DP船将有望全面运行,并将其应用于实际的冰模型测试中。这将是本文的重点。其次,将实际的DP系统安装在模型上并在冰模型盆地中进行测试,以实现模型的实际行为水平,以使其与实际操作尽可能接近。有关此主题的其他信息,请参见Hals和Efraimsson(2011)。这两项发展构成了动态定位船及其冰上DP系统开发的一项重大进步,并为评估其作战能力提供了一种途径。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号