Vale S.A. has recently completed construction of the south berth of its new Pier Ⅳ iron ore export terminal at Ponta de Madeira, Sao Luis in northern Brazil. The south berth began receiving ships up to Valemax size in March 2013. The north berth at Pier Ⅳ is planned to be operational by December 2015. A system of sediment traps has been proposed for Pier Ⅳ with the overall objective to provide high occupancy berthing areas for vessels through minimization of maintenance dredging activities of the berth pockets. The design of the sediment traps was undertaken making use of field investigations, morphodynamic modelling and a number of other analysis techniques to determine corresponding CAPEX and OPEX dredging requirements. An extensive monitoring program will be completed through the ramp up period of initial ship arrivals at the south berth of Pier Ⅳ through 2013 to optimize the trap design and dredging requirements. This paper provides a description of the existing conditions and the development of the initial sediment trap design.
机译:淡水河谷公司(Vale S.A.)最近完成了位于巴西北部圣路易斯的蓬塔德马德拉岛(Ponta de Madeira)新的Ⅳ码头铁矿石出口码头南泊位的建设。南泊位于2013年3月开始接受最大Valemax尺寸的船舶。Ⅳ码头的北泊位计划于2015年12月投入运营。Ⅳ码头的沉积物收集系统已提出,其总体目标是提供高占用泊位区域通过最大程度地减少泊位口袋的维护疏activities活动来减少船舶使用量。沉积物捕集器的设计是通过现场调查,形态动力学建模和许多其他分析技术来确定相应的CAPEX和OPEX疏ging要求的。到2013年,在第Ⅳ码头南泊位首次到达船舶的准备工作期间,将完成一项广泛的监控计划,以优化疏水阀的设计和疏requirements要求。本文介绍了现有条件和初始沉积物捕集器设计的发展。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号