Life-Cycle Management - West Coast Deep Sea Wharf

机译:生命周期管理-西海岸深海码头

获取原文
获取外文期刊封面目录资料

摘要

A major export terminal in the Vancouver Harbour has five shipping berths, two of which consist of timber pile and deck construction with an asphalt overlay. The berths were originally constructed in 1959 and extended in 1965. Little to no maintenance was carried out at the berths till the mid-1990s when an internal assessment raised questions about the condition of the facility. To better understand the situation, a comprehensive inspection of the facility was commissioned in 1996/1997. The inspection revealed widespread deterioration of the timber elements and alternatives to address the situation were investigated. Two alternatives were proposed; complete replacement of the facility and implementation of a phased maintenance program. This paper discusses the life cycle management (LCM) approach that was used to assess the two alternatives. A comparison between the costs of complete replacement and a phased maintenance program is presented.
机译:温哥华港的一个主要出口码头有五个泊位,其中两个由木桩和铺有沥青覆盖层的甲板组成。泊位最初建于1959年,并于1965年扩建。直到1990年代中期,由于内部评估对设施的状况提出质疑,这些泊位几乎没有进行维护。为了更好地了解情况,1996/1997年委托对该设施进行全面检查。检查发现木材元素普遍变质,并研究了解决该问题的替代方法。提出了两种选择;完全更换设施并实施分阶段的维护计划。本文讨论了用于评估这两种选择的生命周期管理(LCM)方法。介绍了完全更换成本与分阶段维护计划之间的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号