首页> 外文会议>Annual meeting of the Decision Sciences Institute >ESTIMATING OPTIMAL PROJECT DURATION AND COST FOR SOFTWARE DEVELOPMENT PROJECTS UNDER CONDITIONS OF TEAM SIZE DEPENDENT PRODUCTIVITY: SYSTEM DYNAMICS PERSPECTIVE
【24h】

ESTIMATING OPTIMAL PROJECT DURATION AND COST FOR SOFTWARE DEVELOPMENT PROJECTS UNDER CONDITIONS OF TEAM SIZE DEPENDENT PRODUCTIVITY: SYSTEM DYNAMICS PERSPECTIVE

机译:在团队规模与生产率相关的条件下,估计软件开发项目的最佳项目持续时间和成本:系统动力学角度

获取原文

摘要

Findings from our System Dynamics model provide useful pointers to software developmentproject managers. Communication effects among project members, resultant productivity lossesand incidental overload are incorporated into this model. Simulating a hypothetical project, wedemonstrate estimating project duration and cost under different scenarios as well as estimatingoptimal team size and optimal project duration.Dividing a project into smaller modules may be beneficial to prevent productivity losses due tocommunication overload. Likewise, starting a project with larger than required team size may bebeneficial to prevent delays rather than to add staff midway to avoid training overload.
机译:我们的系统动力学模型的发现为软件开发提供了有用的指导 项目经理。项目成员之间的沟通影响,导致生产力损失 和偶然的超载被合并到该模型中。模拟一个假设的项目,我们 演示估算不同情况下的项目工期和成本以及估算 最佳团队规模和最佳项目持续时间。 将项目划分为较小的模块可能有益于防止由于以下原因导致的生产力损失 通讯过载。同样,以大于所需团队规模开始的项目可能是 有利于防止延误,而不是中途增加人员以避免培训超负荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号