首页> 外文会议>International conference on water jetting >Commercialization pilot program (CPP) project of force pulse waterjet (FPWJ) stripping for removal of organic and inorganic coatings
【24h】

Commercialization pilot program (CPP) project of force pulse waterjet (FPWJ) stripping for removal of organic and inorganic coatings

机译:力脉冲喷水(FPWJ)剥离的商业化试验计划(CPP)项目,用于去除有机和无机涂层

获取原文

摘要

The FPWJ strip process developed by ES3 under USAF SBIR (Small Business Innovation Research) AF071-317 is a more environmentally-friendly, faster, and more efficient option to the wet chemical stripping processes currently used for removal of organic and inorganic coatings. The completed Phase Ⅱ SBIR developed and validated the FPWJ removal process for chrome plating, HVOF, plasma and combustion type thermal spray coatings without damaging the substrate of actual aircraft components. The ongoing Phase Ⅱ.5 SBIR CPP effort focuses on transitioning the technology from a laboratory environment to an operational production environment, which includes installing a pilot full scale FPWJ system and engineering support activities.
机译:ES3在USAF SBIR(小型企业创新研究)AF071-317下开发的FPWJ剥离工艺是目前用于去除有机和无机涂层的湿化学剥离工艺的一种更环保,更快和更有效的选择。完成的第二阶段SBIR开发并验证了FPWJ去除工艺,该工艺用于镀铬,HVOF,等离子和燃烧型热喷涂涂层,而不会损坏飞机的实际部件。正在进行的第Ⅱ.5阶段SBIR CPP的工作重点是将技术从实验室环境转换为可操作的生产环境,其中包括安装试验性FPWJ试点系统和工程支持活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号