DIABLO CANYON POWER PLANT DIGITAL PROCESS PROTECTION SYSTEM REPLACEMENT LICENSING EXPERIENCE USING ISG-06

机译:Diablo Canyon Power Plant Digital Process Protection System更换许可经验使用ISG-06

获取原文

摘要

This paper provides a summary of the preparation of a License Amendment Request (LAR) for replacement of the existing Diablo Canyon Power Plant (DCPP) Eagle 21 digital Process Protection System (PPS) by Pacific Gas & Electric Company (PG&E) using US Nuclear Regulatory Commission (USNRC) Digital I&C (DI&C) Interim Staff Guidance (ISG) document ISG-06. Licensing Process [1]. The USNRC has designated the LAR for the DCPP PPS replacement project as the pilot application for use of DI&C ISG-06. DI&C ISG-06. Revision 1. issued for use on January 19. 2011. describes the licensing process the NRC staff may use to review an LAR for a DI&C modification. The LAR [2] for the replacement of the Eagle 21 PPS was submitted to the NRC on October 26. 2011, was accepted for review [3] on January 13. 2012. and was approved on December 21. 2016. A more detailed review of the specific PPS replacement design including the Defense-In-Depth and Diversity approach is provided in a paper presented at the 2015 conference [12]. The use of pre-application (Phase 0) public meetings with the NRC staff to ensure the PPS replacement design adequately addressed NRC criteria was instrumental to development of the proposed PPS replacement design. This paper discusses the topics discussed in the Phase 0 meetings and the approach utilized by PG&E for the Phase 0 public meetings to support efficient development of the proposed PPS replacement design. PG&E developed a PPS Replacement diversity and defense-in-depth (D3) Assessment Topical Report [4] that was submitted to NRC in 2010 and approved [5] in 2011. This paper discusses the PG&E use of the D3 assessment to evaluate and optimize the initial PPS replacement design prior to submittal of the design to the NRC for approval. The PG&E experience with preparation of the LAR contents and supporting documents and lessons learned during the detailed design and verification phase is discussed.
机译:本文提供许可证修订请求(LAR)由太平洋天然气和电力公司(PG&E)取代现有的代阿布洛峡谷电厂(DCPP)鹰21个数字化进程保护系统(PPS)的使用美国核管理编制的汇总委员会(USNRC)数字I&C(DI&C)临时人员指导(ISG)文件ISG-06。许可过程[1]。所述USNRC指定了LAR为DCPP PPS替换项目作为使用DI&C ISG-06的导频应用。 DI&C ISG-06。修订1.使用发表了1月19日2011年介绍了定牌加工的NRC人员可以使用它来浏览一个DI&C修改的LAR。在LAR [2]用于替换鹰21 PPS的已提交给NRC上10月26日2011年,被接受以供审查[3] 1月13日2012年和批准了12月21日2016年的更详细的审查具体PPS替换设计,包括防御深度和多样性的方法在2015年会议[12]提出了一种纸张处。采用预申请的(0阶段)与NRC人员公开会议,以确保PPS更换设计充分解决NRC标准是仪器所提出的PPS更换设计的发展。本文讨论了相位0会议和PG&E的相位0公开会议使用的方法讨论的主题,以支持所提出的PPS更换设计的高效发展。 PG&E公司开发的PPS更换多样性和防御纵深(D3)评估专题报告[4]在2010年提交给NRC批准[5]在2011年本文讨论了PG&E使用D3评估,以评估和优化的初始PPS替换设计提交设计到NRC批准之前。有准备的LAR内容和证明文件,并在详细设计和验证阶段的经验和教训PG&E的经验进行了讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号