DIABLO CANYON POWER PLANT DIGITAL PROCESS PROTECTION SYSTEM REPLACEMENT LICENSING EXPERIENCE USING ISG-06

机译:使用ISG-06的DIABLO CANYON电厂数字过程保护系统更换许可经验

获取原文

摘要

This paper provides a summary of the preparation of a License Amendment Request (LAR) for replacement of the existing Diablo Canyon Power Plant (DCPP) Eagle 21 digital Process Protection System (PPS) by Pacific Gas & Electric Company (PG&E) using US Nuclear Regulatory Commission (USNRC) Digital I&C (DI&C) Interim Staff Guidance (ISG) document ISG-06. Licensing Process [1]. The USNRC has designated the LAR for the DCPP PPS replacement project as the pilot application for use of DI&C ISG-06. DI&C ISG-06. Revision 1. issued for use on January 19. 2011. describes the licensing process the NRC staff may use to review an LAR for a DI&C modification. The LAR [2] for the replacement of the Eagle 21 PPS was submitted to the NRC on October 26. 2011, was accepted for review [3] on January 13. 2012. and was approved on December 21. 2016. A more detailed review of the specific PPS replacement design including the Defense-In-Depth and Diversity approach is provided in a paper presented at the 2015 conference [12]. The use of pre-application (Phase 0) public meetings with the NRC staff to ensure the PPS replacement design adequately addressed NRC criteria was instrumental to development of the proposed PPS replacement design. This paper discusses the topics discussed in the Phase 0 meetings and the approach utilized by PG&E for the Phase 0 public meetings to support efficient development of the proposed PPS replacement design. PG&E developed a PPS Replacement diversity and defense-in-depth (D3) Assessment Topical Report [4] that was submitted to NRC in 2010 and approved [5] in 2011. This paper discusses the PG&E use of the D3 assessment to evaluate and optimize the initial PPS replacement design prior to submittal of the design to the NRC for approval. The PG&E experience with preparation of the LAR contents and supporting documents and lessons learned during the detailed design and verification phase is discussed.
机译:本文概述了使用美国核监管局准备更换太平洋天然气和电力公司(PG&E)的现有暗黑破坏神峡谷电厂(DCPP)Eagle 21数字过程保护系统(PPS)的许可证修订请求(LAR)。委员会(USNRC)数字I&C(DI&C)临时员工指南(ISG)文件ISG-06。许可过程[1]。 USNRC已将LAR指定为DCPP PPS替换项目,作为使用DI&C ISG-06的试验应用程序。 DI&C ISG-06。修订版1.于2011年1月19日发布。它描述了NRC工作人员可用来审查LAR进行DI&C修改的许可过程。替换Eagle 21 PPS的LAR [2]已于2011年10月26日提交给NRC,2012年1月13日被接受审核[3],并于12月21日获得批准。2016年。在2015年会议上发表的一篇论文中提供了包括深度防御和多样性方法在内的特定PPS替代设计的详细信息[12]。使用与NRC工作人员进行的预申请(阶段0)公开会议来确保PPS替代设计能够充分满足NRC标准,这对拟议的PPS替代设计的开发至关重要。本文讨论了在第0阶段会议中讨论的主题以及PG&E在第0阶段公开会议中使用的方法,以支持有效开发拟议的PPS替代设计。 PG&E开发了PPS替代多样性和纵深防御(D3)评估专题报告[4],该报告于2010年提交给了NRC,并于2011年获得批准[5]。本文讨论了PG&E使用D3评估来评估和优化最初的PPS替换设计,然后再将设计提交给NRC批准。讨论了PG&E在准备LAR内容和支持文件以及在详细设计和验证阶段学到的经验教训方面的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号