REPLACEMENT OF PLANT MONITORING SYSTEM (PMS) FOR ULCHIN UNIT 12 PLANTS

机译:ulchin单元1和2植物的植物监测系统(PMS)更换

获取原文

摘要

Ulchin Unit 1&2 Nuclear Power Plants (NPPs) have been in operation for over 20 years since 1988. The original plant computer system supplied by Framatome had maintenance difficulties due to aging and obsolescence of the component. KEPCO Engineering & Construction Company, Inc. (KEPCO E&C) successfully completed the replacement project of the Plant Monitoring System (PMS) for Ulchin Unit 1&2 NPPs in 2009. This paper summarizes the system overview for the replacement system, the PMS which consists of Plant Data Acquisition System (PDAS) and Plant Computer System (PCS). It includes system characteristics, functional description, network design, and software design. The system was tested through a various types of testing to verify that the system meets functional, performance, and interface requirements. This paper describes the valuable experience and lessons learned from the replacement project.
机译:自1988年以来,Ulchin Unit 1和2核电站(NPPS)已在运行20多年。由于组件的老化和过时,由粉碎机提供的原始植物计算机系统具有维护困难。 Kepco Engineering&Construction Company,Inc。(Kepco E&C)于2009年成功完成了Ulchin Unit 1&2 NPP的植物监测系统(PMS)的替代项目。本文总结了替代系统的系统概述,该产品由植物组成的PM数据采集​​系统(PDA)和工厂计算机系统(PC)。它包括系统特征,功能描述,网络设计和软件设计。通过各种类型的测试测试系统,以验证系统是否满足功能性,性能和接口要求。本文介绍了从替换项目中吸取的宝贵经验和经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号