首页> 外文会议>International conference on urban regeneration and sustainability >BRT in metropolitan regions: two examples in Brazil
【24h】

BRT in metropolitan regions: two examples in Brazil

机译:BRT在大都市地区:巴西两个例子

获取原文

摘要

Many Brazilian cities are currently implementing BRT (bus rapid transit) systems due to their lower cost and shorter construction time when compared to rail systems. The lobbies of bus operators and manufacturers are also an important issue. Two projects are under way in the state of Sao Paulo, connecting two or more cities within metropolitan regions. The Northwest BRT Corridor is 25.0 km long and connects four cities, catering to a total population of 920,000 inhabitants in the Campinas Metropolitan Region. The Guarulhos Corridor is 4.0 km long and connects Sao Paulo's eastern sector to Guarulhos, both of which are part of the Sao Paulo Metropolitan Region, and caters to 2.6 million inhabitants. This paper describes the process of planning and designing BRT systems in Brazil and presents the traditional path of such projects: feasibility analysis (transportation demand studies, urban insertion and sustainability evaluation and analysis) followed by architecture and engineering design (bus stops and terminals, bus corridor and street network infrastructure).
机译:相比于铁路系统时,许多巴西的城市目前正在实施BRT(快速公交)系统由于其较低的成本和较短的施工时间。公交运营商和制造商的游说也是一个重要问题。两个项目正在进行中的圣保罗州,连接大都市地区中的两个或多个城市。西北BRT走廊长25.0公里四个城市,餐饮连接到92万个居民在坎皮纳斯大都市区的人口总数。该Guarulhos的走廊很长4.0公里和圣保罗的东段连接到瓜鲁柳斯,这两者是圣保罗大都市区的一部分,并且迎合了260万个居民。本文介绍了巴西的规划设计BRT系统,并提出这些项目的传统路径的过程:其次是建筑和工程设计的可行性分析(运输需求的研究,城市的插入和可持续性评估和分析)(公共汽车站,码头,公交车走廊和街道网络基础设施)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号