首页> 外文会议>International conference on urban regeneration and sustainability >BRT in metropolitan regions: two examples in Brazil
【24h】

BRT in metropolitan regions: two examples in Brazil

机译:大城市地区的BRT:巴西的两个例子

获取原文

摘要

Many Brazilian cities are currently implementing BRT (bus rapid transit) systems due to their lower cost and shorter construction time when compared to rail systems. The lobbies of bus operators and manufacturers are also an important issue. Two projects are under way in the state of Sao Paulo, connecting two or more cities within metropolitan regions. The Northwest BRT Corridor is 25.0 km long and connects four cities, catering to a total population of 920,000 inhabitants in the Campinas Metropolitan Region. The Guarulhos Corridor is 4.0 km long and connects Sao Paulo's eastern sector to Guarulhos, both of which are part of the Sao Paulo Metropolitan Region, and caters to 2.6 million inhabitants. This paper describes the process of planning and designing BRT systems in Brazil and presents the traditional path of such projects: feasibility analysis (transportation demand studies, urban insertion and sustainability evaluation and analysis) followed by architecture and engineering design (bus stops and terminals, bus corridor and street network infrastructure).
机译:由于与铁路系统相比,巴西的许多城市成本较低且施工时间较短,因此目前正在实施BRT(公共汽车快速运输)系统。公交运营商和制造商的大厅也是一个重要问题。圣保罗州正在进行两个项目,连接大都市地区的两个或多个城市。西北BRT走廊长25.0公里,连接四个城市,可满足坎皮纳斯大都会地区920,000居民的需求。瓜鲁柳斯走廊长4.0公里,将圣保罗的东部地区连接到瓜鲁柳斯,瓜鲁柳斯都是圣保罗大都会地区的一部分,可容纳260万居民。本文介绍了巴西BRT系统的规划和设计过程,并介绍了此类项目的传统路径:可行性分析(交通需求研究,城市建设以及可持续性评估和分析),然后进行建筑和工程设计(公交车站和终点站,公交车)走廊和街道网络基础设施)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号