首页> 外文会议>International conference on environmental remediation and radioactive waste management >DESIGN OPTIONS FOR HLW REPOSITORY OPERATION TECHNOLOGY, (III) TRANSPOTATION AND HORIZONTAL EMPLACEMENT OF PRE-FABRICATED EBS MODULE (PEM)
【24h】

DESIGN OPTIONS FOR HLW REPOSITORY OPERATION TECHNOLOGY, (III) TRANSPOTATION AND HORIZONTAL EMPLACEMENT OF PRE-FABRICATED EBS MODULE (PEM)

机译:BMW存储库操作技术的设计选项,(in)预制EBS模块(PEM)的运输和水平施加

获取原文
获取外文期刊封面目录资料

摘要

As one of the repository operation technologies for high-level radioactive waste (HLW), the pre-fabricated engineered barrier system module (PEM) was carried out the examination of handling and emplacement technique for engineered barrier system (EBS). The PEM technology was examined to confirm technological applicability. The PEM is concept of the integration of EBS as the module in the surface facilities, and transporting the module underground facilities. This concept is the one of the candidate concepts of horizontal emplacement techniques for EBS in Japan. Therefore, PEM is the same level large size and heavy weight as EBS, and it is necessary to examine the applicability of handling and emplacement techniques. Full-scale level tests were performed to confirm the applicability of these techniques with the air bearing/air jack devices. In the tests, we prepared the testing devices of full-scale level size/weight and confirmed the applicability of these technologies as an elemental technology on the condition of considering the environment of an underground tunnel. The air bearing test that produced the surface-roughness of the tunnel environment was carried out the evaluation concerning the transportation performance of the air bearing. And, the air jack test was carried out the holding and emplacement of PEM. The repository operation technology with the air bearing/jack device was confirmed to execute the examination, and to apply to handling and emplacement technique for PEM.
机译:作为高级放射性废物(HLW)的存储库操作技术之一,进行了预先制造的工程屏障系统模块(PEM)进行了工程屏障系统(EBS)的处理和施加技术的检查。检查PEM技术以确认技术适用性。 PEM是EBS作为表面设施中的模块的集成的概念,并运输模块地下设施。这个概念是日本EBS水平展开技术的候选概念之一。因此,PEM与EBS的大尺寸和重量重相同,有必要检查处理和施加技术的适用性。进行全尺寸水平测试以确认这些技术与空气轴承/空气插孔装置的适用性。在测试中,我们准备了全尺寸级别/重量的测试设备,并确认了这些技术的适用性作为考虑地下隧道环境的条件的元素技术。制造隧道环境的表面粗糙度的空气轴承测试进行了关于空气轴承的运输性能的评价。而且,空气插孔测试是进行PEM的保持和施加。确认使用空气轴承/插孔装置的存储库操作技术执行检查,并适用于PEM的处理和施加技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号