首页> 外文会议>International conference on environmental remediation and radioactive waste management >CONSIDERATIONS FOR GROUT FORMULATIONS FOR FACILITY CLOSURES USING IN SITU STRATEGIES
【24h】

CONSIDERATIONS FOR GROUT FORMULATIONS FOR FACILITY CLOSURES USING IN SITU STRATEGIES

机译:使用原位策略的设施闭合的灌浆配方的考虑因素

获取原文

摘要

The U.S. Department of Energy (DOE) is conducting in situ closures (entombment) at a large number of facilities throughout the complex. Among the largest closure actions currently underway are the closures of the P and R Reactors at the Savannah River Site (SRS), near Aiken, South Carolina. In these facilities, subgrade open spaces are being stabilized with grout; this ensures the long term structural integrity of the facilities and permanently immobilizes and isolates residual contamination. The large size and structural complexity of these facilities present a wide variety of challenges for the identification and selection of appropriate fill materials. Considerations for grout formulations must account for flowability, long term stability, set times, heat generation and interactions with materials within the structure. The large size and configuration of the facility necessitates that grout must be pumped from the exterior to the spaces to be filled, which requires that the material must retain a high degree of flowability to move through piping without clogging while achieving the required leveling properties at the pour site. Set times and curing properties must be controlled to meet operations schedules, while not generating sufficient heat to compromise the properties of the fill material. The properties of residual materials can result in additional requirements for grout formulations. If significant quantities of aluminum are present in the facility, common formulations of highly alkaline grouts may not be appropriate because of the potential for hydrogen generation with the resultant risks. SRS is developing specialized inorganic grout formulations that are designed to address this issue. One circum-neutral chemical grout formulation identified for initial consideration did not possess the proper chemical characteristics, having exceptionally short set times and high heat of hydration. Research efforts are directed toward developing grout formulations that can meet operational requirements for chemical compatibility, extended set times and reduced heat generation.
机译:美国能源部(DOE)正在整个复合体的大量设施中展开原位封闭(矿物质)。目前正在进行的最大的封闭行动是在南卡罗来纳州艾肯河网站(SRS)附近的P和R反应器的关闭。在这些设施中,路基开放空间正在用灌浆稳定;这确保了设施的长期结构完整性,并永久地固定并分离残留污染。这些设施的大尺寸和结构性复杂性为识别和选择适当的填充材料提供了各种各样的挑战。灌浆配方的考虑必须考虑流动性,长期稳定性,设定时间,发热和与结构内材料的相互作用。设施的大尺寸和配置需要将灌浆从外部泵送到待填充的空间,这要求材料必须保留高度的流动性,以通过管道移动而不会堵塞,同时在实现所需的调平特性倒立网站。必须控制设定时间和固化性能以满足操作时间表,同时不会产生足够的热量以损害填充材料的性质。残留材料的性质可以导致灌浆配方的额外要求。如果设施中存在大量铝,则由于具有所得风险的氢气产生的可能性,高度碱性灌浆的常见配方可能不合适。 SRS正在开发专门的无机灌浆配方,旨在解决这个问题。鉴定为初始考虑的一个环中性化学灌浆制剂没有具有适当的化学特性,具有特别短的设定时间和高水合热。研究努力旨在开发植物配方,可以满足化学兼容性,延长设定时间和减少发电的操作要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号