首页> 外文会议>Conference on space telescopes and instrumentation >Status of the assessment phase of the ESA M3 mission candidate LOFT
【24h】

Status of the assessment phase of the ESA M3 mission candidate LOFT

机译:ESA M3任务候选者LOFT评估阶段的状态

获取原文

摘要

LOFT (Large Observatory For x-ray Timing) is one of four candidates for the M3 slot (launch in 2024, with the option of a launch in 2022) of ESAs Cosmic Vision 2015 – 2025 Plan, and as such it is currently undergoing an initial assessment phase lasting one year. The objective of the assessment phase is to provide the information required to enable the down selection process, in particular: the space segment definition for meeting the assigned science objectives; consideration of and initial definition of the implementation schedule; an estimate of the mission Cost at Completion (CaC); an evaluation of the technology readiness evaluation and risk assessment. The assessment phase is divided into two interleaved components: (i) A payload assessment study, performed by teams funded by member states, which is primarily intended for design, definition and programmatic/cost evaluation of the payload, and (ii) A system industrial study, which has essentially the same objectives for the space segment of the mission. This paper provides an overview of the status of the LOFT assessment phase, both for payload and platform. The initial focus is on the payload design status, providing the reader with an understanding of the main features of the design. Then the space segment assessment study status is presented, with an overview of the principal challenges presented by the LOFT payload and mission requirements, and a presentation of the expected solutions. Overall the mission is expected to enable cutting-edge science, is technically feasible, and should remain within the required CaC for an M3 candidate.© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
机译:LOFT(用于X射线计时的大型天文台)是ESA Cosmic Vision 2015 – 2025计划的M3插槽(2024年发射,并可选择于2022年发射)的四个候选之一,因此,它目前正在接受初步评估阶段持续一年。评估阶段的目的是提供实现向下选择过程所需的信息,尤其是:满足分配的科学目标的空间段定义;审议并初步确定执行时间表;完成时的任务成本估算(CaC);对技术就绪性评估和风险评估的评估。评估阶段分为两个相互交织的部分:(i)由成员国资助的团队进行的有效载荷评估研究,其主要目的是对有效载荷进行设计,定义和计划/成本评估,以及(ii)工业系统研究,这与任务的太空部分基本上具有相同的目标。本文概述了有效载荷和平台的LOFT评估阶段的状态。最初的重点是有效载荷设计状态,使读者了解设计的主要特征。然后介绍了空间部分评估研究的现状,并概述了LOFT有效载荷和飞行任务要求带来的主要挑战,并提出了预期的解决方案。总体而言,该任务有望实现最前沿的科学,在技术上可行,并且应保持在M3候选人所需的CaC范围内。©(2012)COPYRIGHT光电仪器工程师协会(SPIE)。摘要的下载仅允许个人使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号