首页> 外文会议>ICMEE 2012;International conference on mechanical and electronic engineering >Research on Determining Subsidiaries' Annual Completed Index of Electric Power Construction Group Company Based on the Grey System Theory
【24h】

Research on Determining Subsidiaries' Annual Completed Index of Electric Power Construction Group Company Based on the Grey System Theory

机译:基于灰色系统理论的电力建设集团公司下属企业年度完成指标确定研究

获取原文

摘要

The aim of this paper is to solve the problem how the electric power construction group company determines the completed amount of each branch every year. It introduced the GM (1, 1) model and gray prediction accuracy requirement, and made some improvement on the model. Then it used the model to predict a subsidiary's annual completed index and the result showed the improved model has higher prediction precision. Finally, used this model to predict the nearly two years of the subsidiary's annual completed indexes.
机译:本文的目的是解决电力建设集团公司每年如何确定每个分支机构的完工量的问题。介绍了GM(1,1)模型和灰色预测精度的要求,并对模型进行了一些改进。然后利用该模型对子公司的年度完成指标进行预测,结果表明改进后的模型具有较高的预测精度。最后,使用此模型来预测子公司年度完成指标的近两年时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号