首页> 外文会议>International conference on transportation engineering;ICTE 2011 >PASSENGER VEHICLE SCHEDULING DURING THE TRANSFORMATION OF OLD PASSENGER TRAIN OPERATION PLAN INTO THE NEW PLAN
【24h】

PASSENGER VEHICLE SCHEDULING DURING THE TRANSFORMATION OF OLD PASSENGER TRAIN OPERATION PLAN INTO THE NEW PLAN

机译:将旧的客运火车运营计划转变为新的计划期间的客车调度

获取原文

摘要

In order to meet market demand and the demand of railway development, railway transportation enterprise makes a great variety of passenger train operation plans in different periods. Reasonably planning passenger vehicle scheduling for the ever-changing train operation plan is an important guarantee to achieve the aim that railway operation is safety, efficiency and the continuance. Research background is introduced, changes between the old passenger train operation plan and the new are analyzed. Combined with work experience, plan method of passenger vehicle scheduling in the condition of using vehicle operating certain trains is proposed, more, in order to further optimize vehicle scheduling, mathematical model and optimization algorithm are established for vehicle scheduling in the condition of vehicle operating uncertain passenger trains.
机译:为了满足市场需求和铁路发展的需求,铁路运输企业在不同时期制定了各种各样的旅客列车运营计划。为不断变化的列车运行计划合理地规划客车调度,是实现铁路运行安全,高效,持续的目标的重要保证。介绍了研究背景,分析了旧旅客列车运行方案与新旅客列车运行方案之间的变化。结合工作经验,提出了在使用一定列车运行的情况下乘用车调度的计划方法,为进一步优化车辆的调度,建立了在车辆运行不确定的情况下调度的数学模型和优化算法。旅客列车。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号