Long term behaviour of temporary prestressed an-chors - 'Keramikos' underground car park station

机译:临时预应力锚的长期行为-'Keramikos'地下停车场

获取原文

摘要

This paper focuses on the long term behavior of temporary prestressed anchors of an existing temporary retaining structure. The scope of the initial project in 1995 was to construct "Keramikos" underground station of Line 3 Athens Metro. In 2007 ATTIKO METRO S.A. had the responsibility to construct within the existing excavation, a new five storey underground car park. The main distinctiveness of the particular project was that for the first time in Greece a temporary retaining structure of a deep excavation active for almost 13 years, being subjected to different loading conditions, had to be used again under submerged conditions. The recorded actual behavior of the retaining structure showed that the global remaining temporary anchor strength was quite significant.
机译:本文着眼于现有临时固位结构的临时预应力锚的长期性能。 1995年的最初项目是建造3号线雅典地铁的“ Keramikos”地铁站。 2007年,ATTIKO METRO S.A.负责在现有挖掘工程中建造一个新的五层地下停车场。该项目的主要特点是,在希腊,首次进行了近13年活跃的深基坑临时固定结构,在不同的荷载条件下,该结构不得不在淹没条件下再次使用。记录的挡土结构实际行为表明,整体剩余的临时锚固强度非常重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号