首页> 外文会议>Annual highway geology symposium >Presidio Parkway Project Phase 1
【24h】

Presidio Parkway Project Phase 1

机译:Presidio Parkway项目阶段1

获取原文

摘要

The project is located in the 200 year-old Presidio, a National Park, in San Francisco, California. An integrated team consisting of Caltrans Geotechnical Services and the joint venture (JV) of Arup and Parsons Brinckerhoff provided geotechnical engineering services. Originally constructed in 1936, the existing Doyle Drive needs design, seismic and traffic safety improvements. The project faces several significant challenges: highly variable and poor geologic conditions in a highly active seismic setting, preserving the natural and historical Presidio resources, providing extensive public outreach and inter-agency coordination for a large group of stakeholders and removing and replacing the existing facility while maintaining traffic during construction. The many innovative ideas utilized in this project include: an integrated team of Caltrans drilling crews and local drilling subcontractors used for the subsurface exploration, a foundation contractor feedback meeting held for the Southbound Presidio Viaduct Bridge, a bridge foundation system design that includes a 12 foot diameter steel casing over a rock socket, a Cement Deep Soil Mixing and Cast in Drilled Hole Test Project, using separate excavation pay items for the different ground conditions, a special subdrain that maintains groundwater flow to the wetlands below a bluff while meeting the project needs of draining a tunnel, a soldier pile tangent beam retaining wall with steeply inclined heavy duty tiebacks used to avoid instability to adjacent facilities, and a lightweight fill combined with a retaining wall used for a temporary detour over soft soils in order to maintain traffic during the 3 to 4 year construction period.
机译:该项目位于200岁的要塞,一个国家公园,旧金山,加利福尼亚州。由交通局岩土工程服务为一体的综合团队和奥雅纳和柏诚的合资企业(JV)提供岩土工程服务。最初于1936年建造,现有尔路需要设计,抗震和交通安全的改善。该项目面临几个显著的挑战:在一个高度活跃的地震环境变化很大,不良地质条件,保护自然和历史的要塞资源,一大群利益相关者提供广泛的公众宣传和机构间的协调与拆卸和更换现有设施同时施工期间保持交通。在这个项目中使用的许多创新的想法包括:交通局钻井队和地方钻探承包商的综合团队用于地下勘探,为南向要塞高架桥,桥梁基础,系统设计,其中包括一个12英尺召开奠定了基础承包商反馈会议直径钢套管在岩石插座,水泥土搅拌和钻孔测试项目铸造,使用单独的挖掘付款项目为不同的地面条件下,保持地下水流向湿地虚张声势以下,同时满足项目需求的特殊subdrain排水隧道,士兵桩切线光束挡土墙与用于避免不稳定性相邻设施陡峭地倾斜重型锚碇,和轻质填料,以便用于通过软土的临时迂回挡土墙期间维持流量的总和3〜4年建设期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号