首页> 外文会议>Institution of Chemical Engineers symposium on hazards >REDUCING THE POTENTIAL FOR MAJOR ACCIDENTS WITHIN THE POWER GENERATION SECTOR BY UTILISING OPERATIONAL EXPERIENCE
【24h】

REDUCING THE POTENTIAL FOR MAJOR ACCIDENTS WITHIN THE POWER GENERATION SECTOR BY UTILISING OPERATIONAL EXPERIENCE

机译:通过利用操作经验减少发电领域内部发生重大事故的潜力

获取原文

摘要

Accidents at Texas City and Buncefield in 2005 have increased awareness of the potential for similar accidents in the UK Power Generation sector. The importance of process safety has been recognised, and the need to focus on the potential for major accidents associated with the release of flammable substances or release of energy from high speed machinery or high voltage electrical systems.Many companies have been implementing Process Safety Management (PSM) systems to assess the risks from their existing operations and improve the performance of risk control systems. This has been a challenge due to the wide range of technology within the sector, with energy sources from fossil fuels to renewable sources, plus many ageing assets within the UK fleet of power stations.This paper will describe how a hazard identification and assessment methodology developed within the chemical sector has been applied to operational Power Stations. The Process Hazard Review (PHR) technique was originally developed in the 1990's by ICI to identify process safety concerns on operational plants following several serious accidents within the company on older plants.A team of knowledgeable operations and technical staff led by a process safety specialist consider each process system and use guidewords to identify credible hazardous events. The severity of the event is assessed, and the reliability and robustness of existing risk control measures judged against site experience and relevant good practice. The overall aim is to utilise the knowledge of staff to identify gaps or weaknesses in the risk control measures, including procedural controls, and make recommendations to address these shortcomings.Many Power Stations have been assessed using PHR in the last few years and the paper describes typical process safety issues that have been identified. It is typical for a relatively large number of recommendations to be raised. The paper will describe a methodology developed to help develop recommendations into clear actions, using a risk based approach and simple cost-benefit analysis.
机译:2005年德克萨斯城和邦菲尔德发生的事故提高了英国发电行业类似事故的潜力的认识。进程安全的重要性得到了认识到,需要关注与高速机械或高压电气系统释放与易燃物质或能量释放的主要事故的可能性.many公司一直在实施过程安全管理( PSM)系统,以评估其现有运营的风险,提高风险控制系统的性能。这是由于该行业内部的广泛技术,从化石燃料到可再生资源的能源,这是一项挑战,加上英国电站内的许多老化资产。本文将描述如何危害识别和评估方法的开发方式在化学领域内已应用于运营电站。该过程危险评论(PHR)技术最初在1990年代开发,通过ICI开发,以确定在旧植物中若干严重事故后的运营植物的流程安全问题。由流程安全专家领导的知识渊博的运营和技术人员团队考虑每个流程系统和使用指南签名以确定可靠的危险事件。评估事件的严重程度,以及现有风险控制措施的可靠性和稳健性,判断出现场经验和相关的良好做法。整体目标是利用工作人员的知识来识别风险控制措施中的差距或缺点,包括程序控制,并提出解决这些缺点的建议。在过去的几年中,使用PHR评估了Many Power站点,并撰写文件描述已识别的典型过程安全问题。它是典型的,用于提出相对大量的建议。本文将使用基于风险的方法和简单的成本效益分析,描述为有助于提出建议的方法而制定的方法,以帮助开发建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号