首页> 外文会议>European Photovoltaic Solar Energy Conference and Exhibition >ON-SITE INSPECTION OF PV MODULES USING AN INTERNATIONALLY ACCREDITED PV MOBILE LAB: A THREE-YEAR EXPERIENCE OPERATING WORLDWIDE
【24h】

ON-SITE INSPECTION OF PV MODULES USING AN INTERNATIONALLY ACCREDITED PV MOBILE LAB: A THREE-YEAR EXPERIENCE OPERATING WORLDWIDE

机译:使用国际认可的PV移动实验室现场检查光伏模块:全球经营的三年经验

获取原文

摘要

Enertis, S.L. overviews the lessons learned from January 2013 to June 2015 using the in-house designed and internationally accredited PV Mobile Laboratory (PVMobLab) for the on-site, cost-effective and high-quality testing of more than 6,000 PV modules from Tier-1, Tier-2 and Tier-3 manufacturers (around 2MWp of samples) in Europe, related to more than 80 plants, including commercial rooftops and utility-scale solar installations. This outstanding PV quality tool has been successfully implemented along the different stages of the lifespan of PV projects, such as batch/pre-shipment acceptance tests, plant acceptance tests, commissioning, O&M or during PV failure and diagnosis tests.
机译:Enertis,S.L.概述从2015年1月到2015年6月汲取的经验教训,使用内部设计和国际认可的PV移动实验室(PVMoblab),用于现场,经济高效,高质量的5,000多个PV模块的测试,来自Tier-1,欧洲的Tier-2和Tier-3制造商(左右2MWp),与80多家工厂相关,包括商业屋顶和公用事业尺度太阳能装置。这种出色的光伏质量工具沿着PV项目的寿命的不同阶段成功实施,例如批量/预发货验收测试,植物验收测试,调试,O&M或PV失效和诊断测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号