CHARTING THE PROGRESS OF PV POWER PLANT ENERGY GENERATING COSTS TO UNSUBSIDIZED LEVELS, INTRODUCING THE PV – LCOE FRAMEWORK

机译:将光伏电站的发电成本推向未补贴的水平,引入光伏-LCOE框架

获取原文

摘要

Fundamental to the widespread global deployment of photovoltaic (PV) power plants is reducing thelevelized cost of electricity (LCOE) to levels that make systems economically attractive without incentives. In recentyears substantial progress has been made to this end with significant reductions seen in all aspects of PV power plantcosts. When speaking of PV power plant economics the industry focuses around three critical metrics: the PV panel andbalance of system (BOS) costs and the cost of energy as measured by LCOE. The PV and BOS costs and LCOE arevaluable tools to track industry progress, but have some limitations that make it desirable to establish a modifiedapproach to track PV power plant energy generation economics. This paper proposes a new framework for categorizingand calculating PV power plant energy generating costs using a system called the PV-LCOE. The PV-LCOE frameworkcombines a cost taxonomy, performance metrics, operating costs, and a simple energy generating cost (LCOE) equationto chart PV power plant cost reduction. The major value of this framework will be to simplify the calculation, identify
机译:在全球范围内广泛部署光伏(PV)发电厂的根本原因是减少了 将电力成本(LCOE)降低到一定水平,使系统在没有诱因的情况下在经济上具有吸引力。在最近 多年来,为实现这一目标已取得了实质性进展,光伏电站的各个方面均实现了显着减少 费用。当谈到光伏电站的经济学时,该行业关注三个关键指标:光伏面板和 由LCOE衡量的系统(BOS)成本和能源成本之间的平衡。 PV和BOS成本以及LCOE为 跟踪行业进步的有价值的工具,但由于存在一些局限性,因此有必要建立一个经过修改的 跟踪光伏电站能源生产经济学的方法。本文提出了一个新的分类框架 并使用称为PV-LCOE的系统计算PV电厂的发电成本。 PV-LCOE框架 结合了成本分类法,绩效指标,运营成本和简单的发电成本(LCOE)方程 绘制光伏电站的成本削减图。该框架的主要价值将是简化计算,确定

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号