摘要:STUCO Solar+Storage Main driving factors,Up to2015,STUCO100%depending on fossil fuel(5.3MVA diesel gensets capacity).More than its78%income was going directly in fuel related operationalcosts.Dutch Government financed the installation to reduceexposure of STUCO to the high cost of fuel withsignificant operational losses.The installation offsets sufficient fuel to significantlyeliminate operational losses.In2017St.Eustatius'grid became the first island in the Caribbean tobe entirely powered by a Solar PV and BESS。