首页> 外文会议>2011 2nd IEEE International Conference on Emergency Management and Management Sciences >A mathematical programming model for optimization problem of production process based on time constraints in Pinggao Group Co., Ltd.
【24h】

A mathematical programming model for optimization problem of production process based on time constraints in Pinggao Group Co., Ltd.

机译:平高集团有限公司基于时间约束的生产过程优化问题数学规划模型

获取原文

摘要

This paper proposes a practical problem of optimization of production process based on time constraints in Pinggao Group Co., Ltd. According to custom's demand, it needs to complete the productive task of designated work pieces in a strict time window. The practical problem is originated form the produce demand. The objective is to minimize the total cost of production process, satisfying the time constraint. In this paper, the practical problem is formulated as an integer programming model. As a case study, a software package (Lingo 9.0) is applied to solve the optimization problem of the production process for slave cylinder in 2nd factory of Pinggao Group Co., Ltd.
机译:本文提出了基于时间约束的平高集团有限公司生产流程优化的实际问题。根据客户的需求,需要在严格的时间范围内完成指定工件的生产任务。实际问题源于生产需求。目的是使生产过程的总成本最小化,以满足时间限制。本文将实际问题表述为整数规划模型。作为案例研究,在平高集团有限公司第二工厂中,使用软件包(Lingo 9.0)解决了从动缸生产工艺的优化问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号