首页> 外文会议>International conference on information computing and applications >Geotechnical challenges and strategies at McArthur River Operation
【24h】

Geotechnical challenges and strategies at McArthur River Operation

机译:麦克阿瑟河行动的岩土挑战和战略

获取原文

摘要

High pressure water inflow has been identified as one of the most critical challenges in mining the world's highest-grade uranium deposit at McArthur River Operation, Cameco Corporation. The ore deposit is approximately 530 m below surface and adjacent to the water bearing Athabasca sandstone, graphitic, and highly altered ground. This paper summarizes the comprehensive geotechnical challenges and corresponding strategies that have been used over years to successfully develop and mine the deposit. These comprehensive ground control strategies have been proven to be efficient and satisfactory to the risk tolerance of the operation.
机译:在Cameco Corporation的McArthur River Operation开采世界上最高品位的铀矿藏中,高压水流入已被确定为最关键的挑战之一。矿床在地表以下约530 m,毗邻含水的Athabasca砂岩,石墨和高度蚀变的地面。本文总结了多年来成功开发和开采该矿床所面临的综合岩土工程挑战和相应的策略。这些综合的地面控制策略已被证明对于操作的风险承受能力是有效且令人满意的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号