【24h】

A new method of self-excitation simulation in power grid black-start

机译:电网黑启动中自激仿真的新方法

获取原文

摘要

The hydrogenerator's self-excitation problem must be taken into consideration seriously in the process of charging no-load long transmission line when implementing black-start for the important power plant in a regional power network which occurs blackout. This paper we propose a new way to simulate the unit's self-excitation when charging no-load long line with the use of Power System Analysis Software Package. Then this method is applied to a practical black-start path that Baoquan hydropower plant starts Fenghe thermal power plant. And the simulation result is verified right through the practical impedance comparison criterion for judging self-excitation.
机译:在发生停电的区域电网中,对重要电厂实施黑启动时,在给空载长输电线充电的过程中,必须认真考虑水轮发电机的自励问题。本文提出了一种利用电力系统分析软件包对空载长线路进行充电时模拟机组自励磁的新方法。然后将该方法应用于宝泉水电厂启动凤河热电厂的实用黑启动路径。并通过实用的阻抗比较判据验证了仿真结果,以判断自励磁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号