首页> 外文会议>Annual International Bridge Conference >Construction of a Grade Separated Intersection in 56 Days
【24h】

Construction of a Grade Separated Intersection in 56 Days

机译:在56天内建造一个等级分隔的十字路口

获取原文

摘要

The major feature of VDOT's $116M Route 29 Solutions project is upgrading the highly-skewed at-grade intersection at Rio Road. Only 103 days of road closure for cross traffic and no closure of Rte. 29 was allowed for the construction of a bridge and several thousand feet of retaining wall. A structural system that had never before been constructed in Virginia was developed to allow traffic to continue operating throughout construction and delivered in nearly half of the allowable time and well under budget.
机译:VDOT 116米的第29号航线解决方案项目的主要特点正在升级Rio Road的高度倾斜的级交叉口。交叉交通只有103天的道路关闭,没有rte关闭。允许建造一座桥梁和几千英尺的挡土墙。从未在弗吉尼亚建造之前从未在弗吉尼亚建造过的结构系统,以便交通在整个施工中继续运营,并在占用时间的近一半和预算下交付。