首页> 外文会议>Annual International Bridge Conference >Response of Concrete-Filled Tubular FRP Arches to Construction-Induced Loading
【24h】

Response of Concrete-Filled Tubular FRP Arches to Construction-Induced Loading

机译:混凝土管状FRP拱门对施工诱导负荷的响应

获取原文

摘要

In this study, the structural response of concrete-filled tubular FRP arch bridges to construction loads, including filling of the arch with wet concrete and backfilling the structure after the arch concrete is sufficiently cured, is assessed. Local tube buckling capacity was examined experimentally and using FEA. The effect of soil backfilling was addressed with a nonlinear beam FE model that tracks the installation of each soil lift on alternate ends of the structure.
机译:在这项研究中,将混凝土管状FRP拱桥的结构响应施加到施工载荷,包括用湿混凝土填充拱形并在拱混凝土充分固化后回填结构。实验检查局部管屈曲能力并使用FEA。用非线性梁Fe模型解决了土壤回填的影响,该非线性梁FE模型跟踪了结构的替代端部的每个土壤升降机的安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号