I-76 ALLEGHENY RIVER BRIDGE-PENNSYLVANIA'S FIRST LONG SPAN CAST-IN-PLACE CONCRETE SEGMENTAL BRIDGE

机译:I-76 Allegheny River Bridge-Pennsylvania的第一个长期跨度铸造混凝土节段桥

获取原文

摘要

The 1-76 Allegheny River Bridge, Pennsylvania's first cast-in-place balanced cantilever bridge, is currently under construction and features a 532' main span across the Allegheny River. The construction is occurring between the 2007 USGA Open and the 2010 LPGA Open, both held at the historic Oakmont Country Club, which is adjacent to the bridge site on the eastern side. Walsh Construction Company (Walsh) was awarded the contract in May 2007 with a low bid of $189 million. The entire project includes construction of the new river bridge, approximately two (2) miles of roadway, reconstruction of the Allegheny Valley Interchange ramps and interchange bridge, construction of three (3) major retaining walls, and demolition of the existing bridge.
机译:宾夕法尼亚州的第一个演出式平衡悬臂桥1-76座1-76座,目前正在建设中,并拥有532英寸的Allegheny河的主要跨度。 2007年USGA开放和2010年LPGA开放之间的建设,都在历史悠久的奥克蒙乡村俱乐部,毗邻东侧的桥梁。沃尔什建筑公司(沃尔什)于2007年5月授予合约,低价为1.89亿美元。整个项目包括新河桥的建设,大约两(2)英里的巷道,重建Allegheny谷交换坡道和交换桥,建造三(3)个主要挡土墙,并拆除现有桥梁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号