首页> 外文会议>26th Annual International Bridge Conference 2009 : IBC 2009 : Meeting bridge challenges in challenging times >I-76 ALLEGHENY RIVER BRIDGE-PENNSYLVANIA'S FIRST LONG SPAN CAST-IN-PLACE CONCRETE SEGMENTAL BRIDGE
【24h】

I-76 ALLEGHENY RIVER BRIDGE-PENNSYLVANIA'S FIRST LONG SPAN CAST-IN-PLACE CONCRETE SEGMENTAL BRIDGE

机译:I-76阿勒格尼河桥-宾夕法尼亚州第一座长跨距现浇混凝土分段桥

获取原文
获取原文并翻译 | 示例

摘要

The 1-76 Allegheny River Bridge, Pennsylvania's first cast-in-place balanced cantilever bridge, is currently under construction and features a 532' main span across the Allegheny River. The construction is occurring between the 2007 USGA Open and the 2010 LPGA Open, both held at the historic Oakmont Country Club, which is adjacent to the bridge site on the eastern side.rnWalsh Construction Company (Walsh) was awarded the contract in May 2007 with a low bid of $189 million. The entire project includes construction of the new river bridge, approximately two (2) miles of roadway, reconstruction of the Allegheny Valley Interchange ramps and interchange bridge, construction of three (3) major retaining walls, and demolition of the existing bridge.
机译:宾夕法尼亚州的第一座现浇平衡悬臂桥1-76 Allegheny River Bridge目前正在建设中,横跨Allegheny River的主要跨度为532'。建造工作在2007年USGA公开赛和2010 LPGA公开赛之间进行,两者均在历史悠久的Oakmont乡村俱乐部举行,该俱乐部毗邻东侧的桥梁工地。rnWalsh Construction Company(Walsh)于2007年5月获得了合同最低出价为1.89亿美元。整个项目包括建造新的河桥,约两(2)英里的道路,重建阿勒格尼山谷立交桥和互换桥,建造三(3)个主要挡土墙以及拆除现有桥梁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号