首页> 外文会议>Annual International Bridge Conference >Design of the Brent Spence Bridge Replacement
【24h】

Design of the Brent Spence Bridge Replacement

机译:布伦特Spence桥更换设计

获取原文

摘要

This paper will highlight the innovative design features of the final three alternatives for the replacement of the Brent Spence Bridge between Cincinnati, OH and Covington, KY. The new crossing poses many design challenges, including the requirement to carry 20 lanes of traffic (striped for twelve lanes + eight full-sized shoulders), which, combined with a width limitation, requires the new bridge to be double-decked. The alternatives to be described include: one tied-arch and two cable-stayed bridges, one double-tower and one single-tower.
机译:本文将重点介绍最后三种替代方案的创新设计功能,以替代俄亥俄州辛辛那提和肯塔基州卡温顿之间的布伦特·斯彭斯大桥。新的人行横道带来了许多设计挑战,包括要求载运20条车道(条带化为12条车道+ 8个全尺寸路肩),再加上宽度限制,要求新桥必须是双层的。将要描述的替代方案包括:一座系杆拱和两座斜拉桥,一座双塔和一座单塔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号