首页> 外文会议>International conference on ocean, offshore and arctic engineering;OMAE2010 >PILOT MODEL TESTS ON THE 'GREEN WATER CONCEPT' FOR WAVE ENERGY CONVERSION WITH MODEL SCALE POWER TAKE OFF (PTO) MODELLING
【24h】

PILOT MODEL TESTS ON THE 'GREEN WATER CONCEPT' FOR WAVE ENERGY CONVERSION WITH MODEL SCALE POWER TAKE OFF (PTO) MODELLING

机译:带有模型规模取力(PTO)建模的波能转换“绿色水概念”的试点模型测试

获取原文

摘要

This paper presents the pilot model tests on the 'Green Water Concept' for wave energy conversion. These tests also included the initial modelling of an electric and hydraulic Power Take Off (PTO). The accurate modelling of a PTO is an important aspect in testing of wave energy conversion concepts numerically and in a wave tank: at the moment that energy is converted into electricity in the PTO, the hydrodynamic behaviour of the structure is changing. The present tests confirmed the high motions and large amount of green water of the Green Water Concept as predicted in previous simulations. The application of a real PTO gave important insight in the possibilities and challenges of PTO modelling at model scale. For the present concept a mean Power (at full scale) close to 1MW was generated in a regular wave of H=3.0m for the maximum possible setting in the chosen test set-up. This setting was limited by the chosen mechanical and electronic motor set-up in this pilot test series, not the actual maximum of the Green Water Concept itself. Considering the test results, it is clear that the potential of the system is significantly larger.
机译:本文介绍了在“绿色水概念”中用于波能转换的试验模型测试。这些测试还包括对电动和液压取力器(PTO)的初始建模。 PTO的精确建模是在数值上和波浪罐中测试波浪能转换概念的重要方面:在PTO中能量转换为电能的那一刻,结构的流体力学行为正在发生变化。当前的测试证实了绿色水概念的高运动和大量绿色水,如先前的模拟所预测的那样。实际PTO的应用为在模型规模上进行PTO建模的可能性和挑战提供了重要的见识。对于本概念,在选定的测试设置中,在最大可能设置为H = 3.0m的规则波中,产生了接近1MW的平均功率(满量程)。此设置受此先导测试系列中选择的机械和电子马达设置的限制,而不是“绿水概念”本身的实际最大值。考虑到测试结果,很明显该系统的潜力更大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号