首页> 外文会议>International symposium on progress in safety science and technology;2010 ISSST >Research on Economic Benefit Evaluation of Qiantang Dyke for Defending Storm Tide
【24h】

Research on Economic Benefit Evaluation of Qiantang Dyke for Defending Storm Tide

机译:钱塘江防洪的经济效益评价研究。

获取原文

摘要

The flood control standard of Qiantang dyke is greatly enhanced after two stages construction of 1950-1957 and 1997-2003, and dyke constructed plays an important role in defending storm tide and flood. The economic benefits of the first-stage and the second-stage projects in defending storm tides are evaluated by utilizing the real-year method and the frequency-curve method based on study on numerical model of storm tides and property analyzing method. The cost of the first-stage project is 0.182 billion RMB and the benefit is 1.950 billion, so the ratio of cost/benefit is 10.71. The cost of the second-stage project is 2.556 billion and the benefit is 9.941 billion, so the ratio of cost/benefit is 3.89. The results show that Qiantang dyke can greatly reduce the economic loss caused by storm tide.
机译:经过1950-1957年和1997-2003年的两阶段建设,钱塘江大堤的防洪标准得到了大大提高,修建的堤防在防洪防洪方面发挥着重要作用。在研究风暴潮数值模型和特性分析方法的基础上,运用实测年法和频率曲线法对一,二期工程防洪的经济效益进行了评价。一期工程造价为1.82亿元,效益为19.50亿元,成本效益比为10.71。二期工程成本为25.56亿元,效益为99.41亿元,成本效益比为3.89。结果表明,钱塘江堤可以大大减少暴风雨造成的经济损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号