Newmont's Boddington Gold Mine tailings pipelines. Hydraulic design issues and comparisons with operating data

机译:NewMont的Boddington金矿尾矿管道。液压设计问题和与操作数据的比较

获取原文

摘要

The design of the tailings disposal system at Newmont's recently commissioned 100,000 tonnes of ore per day Boddington Gold Mine included some unique challenges. Laboratory tests revealed the tailings settled rapidly, forming a very compact bed. This required special considerations for restart after an emergency shutdown and provisions for dumping the slurry from the pipelines if necessary. The design required uninterrupted deposition of tailings into the 15 km~2 dam concurrent with ongoing activities inside the dam such as mining, HDPE lining, wall construction and pipe relocation. Methods for managing slack flow in the dam distribution pipelines were also required. Design issues are discussed and some initial operating data presented.
机译:NewMont最近委托每天100,000吨矿石的尾矿处理系统的设计Boddington Gold Line包括一些独特的挑战。实验室测试显示尾矿迅速落户,形成非常紧凑的床。如果有必要,这需要在紧急停机和倾倒浆料从管道倾倒浆料后重启的特殊考虑因素。该设计要求尾矿沉积不间断地沉积到15公里〜2大坝同时,在坝内持续的活动,如采矿,HDPE衬里,墙面施工和管道搬迁。还需要用于管理大坝分配管道中松弛流的方法。讨论了设计问题,并呈现了一些初始操作数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号