首页> 外文会议>IEEE PES Transmission and Distribution Conference and Exposition >Assessment of Indian power sector reform through productivity analysis: Pre and post electricity Act, 2003
【24h】

Assessment of Indian power sector reform through productivity analysis: Pre and post electricity Act, 2003

机译:通过生产率分析评估印度电力部门的改革:《电力法》,2003年之前和之后

获取原文

摘要

Structure of power sector all-round the world is changing from regulated to deregulated environment to enhance the technical efficiency and financial viability through private sector participation thereby increasing competition. Asian developing countries are also motivated by the restructuring process and India is no exception to it. The Indian power sector has undergone significant changes since 1990 by opening gateway for the independent power producers (IPPs). This paper discusses the major policy and regulatory changes occurred since 1991 in chronological order in section III. Technical and economical performance of the power sector has been compared in relation to the pre and post electricity Act, 2003. In continuation, Malmquist Productivity Index is employed to determine productivity change for the period 1999–2005. The procedure adopted and the results are explained in details in section VI. The results of Malmquist Productivity will help to investigate the productivity change attributed by technological aspects.
机译:全世界电力部门的结构正从管制环境转变为管制环境,以通过私营部门的参与来提高技术效率和财务可行性,从而加剧竞争。亚洲发展中国家也受到重组过程的鼓舞,印度也不例外。自1990年以来,印度电力部门发生了巨大变化,为独立电力生产商(IPP)开放了门户。本文按时间顺序讨论了自1991年以来发生的主要政策和法规变更。已将电力部门的技术和经济绩效与2003年《电力法》前后的标准进行了比较。此后,继续使用Malmquist生产率指数来确定1999-2005年期间的生产率变化。第六节详细说明了所采用的程序和结果。 Malmquist生产率的结果将有助于调查技术方面的生产率变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号