首页> 外文会议>International Yellow River forum on ecological civilization and river ethics;2009 IYRF >Study on Management Mode of Flood Control Projects in Lower Yellow River-the Subject Study of ADB Loan Project for Yellow River Flood Control
【24h】

Study on Management Mode of Flood Control Projects in Lower Yellow River-the Subject Study of ADB Loan Project for Yellow River Flood Control

机译:黄河下游防洪工程管理模式研究-亚行黄河防洪贷款工程主题研究

获取原文

摘要

There are three management modes of flood control projects in lower Yellow River, namely the System of Project Corporation Responsibility, Self-management System and Agent Construction System. This paper firstly makes analysis and comparison of advantage and disadvantage of these three modes. According to management practice of Asian Development Bank (ADB)loan project for Yellow River flood control, this paper concludes a new type project construction mode-the Comprehensive Management Mode. It assimilates advantage from three existing modes and is provided with advanced management concept of ADB.
机译:黄河下游防洪工程有三种管理模式,即项目法人责任制,自我管理制度和代建制。本文首先对这三种模式的优缺点进行了分析和比较。根据亚洲开发银行黄河防洪贷款项目的管理实践,总结出一种新型的项目建设模式-综合管理模式。它吸收了三种现有模式的优势,并具有亚行的先进管理理念。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号