Modeling risk factors dependence using Copula method for assessing software schedule risk

机译:使用Copula方法建模风险因素依赖性以评估软件计划风险

获取原文

摘要

Based on risk factor method, a model for building dependence among risk factors is discussed for assessing schedule risk of software project. Three main risk factors which influence software schedule are described. Copula method is used to model the dependence among risk factor, and Monte Carlo method is adopted to simulate the schedule risk model. The empirical results from a Communication Corporation show that schedule risk of the new software project is overestimated without modeling the dependence among risk factors. Moreover, the model with considering risk factor dependence by Copula can assess the schedule risk accurately.
机译:基于风险因素法,讨论了建立风险因素之间依存关系的模型,以评估软件项目的进度风险。描述了影响软件进度的三个主要风险因素。采用Copula方法对风险因素之间的依赖关系进行建模,采用蒙特卡洛方法对进度风险模型进行仿真。来自Communication Corporation的经验结果表明,在不对风险因素之间的依赖性进行建模的情况下,高估了新软件项目的进度风险。此外,考虑到Copula对风险因素的依赖性,该模型可以准确评估进度风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号