首页> 外文会议>International conference on soil mechanics and geotechnical engineering;ICSMGE >Performance evaluation of the MT-pile? applied in the IBIS Amsterdam project
【24h】

Performance evaluation of the MT-pile? applied in the IBIS Amsterdam project

机译:MT桩的性能评估?在IBIS Amsterdam项目中应用

获取原文
获取外文期刊封面目录资料

摘要

Within the project 'Extension of the Amsterdam IBIS Hotel' the MT-pile? has been applied. The pile is installed using a vertically driven Tunnel Boring Machine. At the time of the design, no proven models or parameters were available for this large diameter casing pile. Loss on effective stress at the pile tip was of most concern, resulting in unacceptable pile settlement. The monitoring program applied during construction resulted in load settlement curves for each pile. These curves indicate a uniform, direct pile response and a maximum pilehead settlement of 20 mm at completion of the project. These results indicate that the loss of effective stress at pile tip level is compensated during construction of the pile and that the MT-pile can be modelled without loss of soil stress.
机译:在“阿姆斯特丹IBIS酒店扩展”项目中,MT-pile?已应用。使用垂直驱动的隧道掘进机安装桩。在设计时,尚无适用于此大直径套管桩的可靠模型或参数。桩尖有效应力的损失是最令人关注的问题,导致桩沉降不可接受。在施工过程中应用的监控程序得出了每个桩的荷载沉降曲线。这些曲线表明在项目完成时均匀,直接的桩响应和最大桩头沉降为20 mm。这些结果表明,在桩的施工过程中,有效补偿了桩尖处的有效应力损失,并且可以模拟MT桩而不会损失土壤应力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号