首页> 外文会议>第九届国际重载大会(9th International Heavy Haul Conference)论文集 >Upgrading from a CTC into a CBTC System in a Dense Traffic Heavy-Haul Railroad
【24h】

Upgrading from a CTC into a CBTC System in a Dense Traffic Heavy-Haul Railroad

机译:在密集交通重载铁路中从CTC升级到CBTC系统

获取原文

摘要

MRS Logistica S/A, a large Brazilian heavy haul railroad that connects the three largest Brazilian cities-Sao Paulo, Rio de Janeiro and Belo Horizonte-has started to deploy in 2007 a recently acquired CBTC (Communications Based Train Control) system, known as SI ACO (Integrated Operations Control and Automation System), to replace existing signaling and control systems that are based on a CTC ( Centralized Traffic Control) architecture. As a premise, the new system should have a deployment plan where the new system would have to coexist with the existing CTC system, in a way that the deployment process would be transparent to the railroad operation (no impacts, no unsafe operation).This paper presents the most important challenges faced so far along the development and deployment of the SIA-CO system, describing the engineering solutions designed to overcome them, like the strategy for a gradual deployment , the coexistence with the existent CTC system and the operation of non-equipped trains in a CBTC are-a. The SIACO system has started to operate in a Pilot area in May of 2008 and it's expected to be fully deployed at all the railroad extension by 2010.
机译:MRS Logistica S / A是连接巴西三个最大城市(圣保罗,里约热内卢和贝洛奥里藏特)的大型巴西重载铁路,已于2007年开始部署最近收购的CBTC(基于通信的火车控制)系统。 SI ACO(集成运营控制和自动化系统),以取代基于CTC(集中交通控制)体系结构的现有信令和控制系统。作为前提,新系统应具有新的系统必须与现有CTC系统共存的部署计划,以使部署过程对铁路运营透明(无影响,无不安全的运营)。本文介绍了SIA-CO系统开发和部署过程中迄今为止面临的最重要挑战,描述了旨在克服这些挑战的工程解决方案,例如逐步部署的策略,与现有CTC系统的共存以及非CTC系统的运行。 CBTC配备的火车是-a。 SIACO系统已于2008年5月在试点地区开始运行,预计到2010年将在所有铁路延伸线上全面部署。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号