The City of Greater Sudbury is a mining community in Northern Ontario,Canada, originally founded as a camp for railway workers in 1883. Years of environmentaldegradation from industry saddled the city with the reputation of having a barrenlandscape rife with pollution. With the 1970s came the advent of a paradigm shift in thearea. The City of Greater Sudbury initiated an unprecedented land reclamation program,and has since become a case study in commitment to environmental protection and rehabilitation.This paper tells the story of another chapter in the re-greening of Sudbury.Measuring approximately 20 km in length, Junction Creek flows through downtownSudbury, Ontario, and receives inputs from a variety of sources including industrialfacilities, urban runoff, and a downstream sewage treatment plant. Much of the creek isheavily engineered and forms a major part of Sudbury’s urban drainage system. In responseto the discovery of creosote impacts in the creek in 1999, several investigationswere conducted, including a Screening Level Risk Assessment (SLRA) identifyingbenzo(a)pyrene (B(a)P) as the main parameter of concern with respect to human health.The SLRA also developed cleanup targets for the creek bed. The remedial design includedconstruction of earthen dams and the use of bypass pumps to divert creek flowaround the work area. Excavated sediments were dewatered and sampled to determinedisposal requirements. A contingency plan consisting of confinement through the placementof geosynthetic clay liner (GCL) was developed in the event that impacts aboveSLRA criteria were encountered below the design excavation depth. A synergistic approachto site rehabilitation was adopted, in which the long-term goals of local interestgroups were incorporated into the design. The site access road was left in place for use bythe Rainbow Routes Association to complete the Sudbury leg of the Trans Canada Trail.Creek banks were restored with reduced slopes to minimize erosion and prevent slopefailure. To increase bed morphology and improve aquatic life habitat, riffles and poolswere constructed in the channel. A post-remediation monitoring program has been implemented,consisting of visual inspection, field monitoring and water sampling. Initialresults indicate that remediation was successful in addressing potential risk to receptors,and the placement of GCL has mitigated the risk of the migration of any additional potentiallyimpacted sediments.
机译:大萨德伯里市是安大略省北部的一个采矿社区, 加拿大最初成立于1883年,当时是铁路工人的集中营。 工业的退化使这座城市以贫瘠的声誉而备受困扰 景观盛行与污染。 1970年代出现了范式转变的问世。 区域。大萨德伯里市发起了一项史无前例的土地开垦计划, 从那时起,它就成为致力于环境保护和恢复的案例研究。 本文讲述了萨德伯里(Sudbury)重新绿化的另一章故事。 交界溪长约20公里,流经市区 安大略省的萨德伯里,并从包括工业在内的各种来源获得投入 设施,城市径流和下游污水处理厂。小河的大部分是 经过精心设计,是萨德伯里城市排水系统的重要组成部分。作为回应 1999年在河中发现杂酚油影响的几项调查 进行了包括筛查水平风险评估(SLRA)的鉴定, 苯并(a)((B(a)P)是与人类健康有关的主要参数。 SLRA还为小河床制定了清理目标。包括的补救设计 修建土坝并使用旁通泵转移小溪流量 工作区周围。挖掘的沉淀物经过脱水并取样以确定 处置要求。应急计划,包括通过安置进行的禁闭 在以下情况下,开发了土工合成材料粘土衬里(GCL) 在设计开挖深度以下遇到了SLRA标准。协同方法 进行了现场修复,其中地方利益的长期目标 组被合并到设计中。现场访问道路留在原处,供以下人员使用 彩虹之路协会(Rainbow Routes Association)完成了Trans Canada Trail的萨德伯里(Sudbury)脚。 通过减少坡度来恢复河岸,以最大程度地减少侵蚀并防止坡度 失败。增加床的形态并改善水生生物的栖息地,浅滩和水池 在通道中构建。已实施了补救后监控程序, 包括外观检查,现场监测和水采样。最初的 结果表明,补救措施成功地解决了潜在的受体风险, GCL的放置降低了任何其他潜在迁移的风险 受影响的沉积物。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号