首页> 外文会议>World environmental and water resources congress >Long-Term Optimal Scheduling of Cascade Hydropower Plants in the Primary Market: The Wujiang River Case
【24h】

Long-Term Optimal Scheduling of Cascade Hydropower Plants in the Primary Market: The Wujiang River Case

机译:跨国市场中级联水电站的长期优化调度:吴江岩

获取原文

摘要

As the further development of market-oriented power system reform in southwest China, hydropower system in the regions where electricity market reform has not been developed must be prepared for the upcoming market environment. This study analyses the primary market environment of Wujiang hydropower system, which determine the year-end energy storage solutions, for long-term optimal scheduling. Scheduling of Wujiang cascade hydropower plants pursue two goals: one is to realize the coordinated and stable operation of hydro-thermal system, another is to maximize the revenue of hydropower system. In this paper, a long-term optimal scheduling model of cascade hydropower plants with generation rights trading is proposed. The model achieves maximum comprehensive revenue by optimizing the power generation revenue and the energy storage revenue at the end of the planning horizon. The proposed model is applied to the operations of Wujiang cascade hydropower plants, and the properties of the model are also discussed.
机译:作为进一步发展中国西南部市场的电力系统改革,水电系统在未开发电力市场改革的地区,必须为即将到来的市场环境准备。本研究分析了吴江水电系统的主要市场环境,用于长期最佳调度的年终储能解决方案。吴江瀑布水电站追求两个目标的调度:一个是实现水热系统的协调和稳定运行,另一个是最大限度地提高水电系统的收入。本文提出了一种具有发电权交易的级联水电站的长期优化调度模型。该模型通过在规划地平线结束时优化发电收入和能量存储收入来实现最大的全面收入。所提出的模型适用于吴江级联水电站的操作,还讨论了模型的性质。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号