Willwood Dam was built in 1924 as a diversion dam for irrigation. It is a run-of-the river reservoir located at a developing point bar in Wyoming, U.S.A. Based on current operating criteria, the release flow is restricted by an allowable turbidity increase of 10 Nephelometric Turbidity Units (NTU) from upstream to downstream of the dam. Currently, two of the three sluice gates have been clogged by siltation. These limited sluicing capacities have increased the sedimentation within the reservoir and the irrigation canal network. In this study, de-siltation alternatives combining dredging, sluicing, and flushing were recommended to achieve the dam’s operation goals and restrict sediment accumulation. Three operation curves and three dredging alternatives were used to evaluate sediment flushing/sluicing performances by using GSTARS 3.01 models. This study presents an efficiency analysis of the de-siltation alternatives, the expected operation life, and recommendations for this dam rehabilitation project.
机译:Willwood Dam建于1924年,成为灌溉的转移大坝。它是一个河流水库,位于美国在美国的开发点栏上,基于当前的操作标准,释放流量受到10个浊度浊度单元(NTU)的允许浊度增加(NTU)的限制在下游坝。目前,三个闸门中的两个被淤积堵塞。这些有限的舒仓能力增加了储层内的沉降和灌溉运河网络。在这项研究中,建议使用疏浚,舒适和冲洗结合的脱硅替代品,以实现大坝的运行目标并限制沉积物积累。使用GSTARS 3.01型号来使用三个操作曲线和三种疏浚替代品来评估沉积物冲洗/迷航性能。本研究提出了对该大坝康复项目的脱硅替代品,预期运营寿命和建议的效率分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号