PERFORMANCE MODELING OF UNFIRED STEAM CYCLE USING SINGLE DUAL PRESSURE ONCE-THROUGH STEAM GENERATOR

机译:使用单和双压力一次通过蒸汽发生器性能建模未使用的蒸汽循环

获取原文

摘要

The high thermal efficiency and the use of low carbon content fuel (e.g., natural gas) have made the Combined Cycle Power Plant (CCPP) one of the best choices for power generation due to its benefits associate with low cost and low environmental impact. The performance of Unfired Steam Cycle (USC) as a part of the CCPP has significant impact on the performance of the whole power plant as it provides the CCPP with around one third of the total useful power. An accurate performance simulation of the USC is therefore necessary to analyze the effects of various operating parameters on the performance of combined cycle power plant. In this paper, a performance simulation approach for an unfired steam cycle using single and dual pressure-level of an OTSG is presented. The developed modeling method has been applied to the performance simulation of an existing unfired steam cycle power generation unit installed at Manx Electricity Authority and the results are promising. A comparison between simulated and actual performance at design and off design operating conditions of the same USC has shown a remarkable agreement with errors values below 1 %.
机译:由于其优势与低成本和低环境影响,因此,高热效率和低碳含量燃料(例如,天然气)的使用使组合的循环发电厂(CCPP)成为了发电的最佳选择之一。由于其提供了对整个电厂的性能,因此,未终止的蒸汽循环(USC)的性能对整个电厂的性能产生了重大影响,因为它提供了总有用电力的三分之一的CCPP。因此,需要对USC进行准确的性能模拟,以分析各种操作参数对组合循环发电厂性能的影响。本文介绍了使用OTSG的单个和双压级​​的未引用蒸汽循环的性能模拟方法。开发的建模方法已应用于安装在曼克克克克斯电权威的现有未引用的蒸汽循环发电单元的性能模拟,结果是有前途的。模拟和实际性能在同一USC的设计和OFF设计操作条件之间的比较已显示出显着的达法符合低于1%的错误值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号