ZhanJiang Bay Crossing linking with the provincial expressway S373 in Guangdong is a majorbridge crossing over Maxie Channel. The main Bridge is a composite cable-stayed bridge withdouble pylons, two cable planes and main span of 480m. The side span adopts concrete beam, whilethe remaining part of this bridge adopts steel box girder. Having two pylons of curved torch shape,streamline hollow steel box girder, and advanced collision protection structure for pylonfoundations, this bridge has several technical breakthroughs in cable-stayed bridge design.Zhanjiang Bay Bridge was commenced on July, 2003, completed and opened to traffic on December,2006; the total project cost is about CNY 1.25 billion.Several new technologies in terms of structural design, anti-collision of pylon, and healthmonitoring system of this bridge are introduced herein.
展开▼