New Technology for Cable-stayed Bridge Design of Zhanjiang Bay Crossing

机译:湛江跨海大桥斜拉桥设计新技术

获取原文

摘要

ZhanJiang Bay Crossing linking with the provincial expressway S373 in Guangdong is a majorbridge crossing over Maxie Channel. The main Bridge is a composite cable-stayed bridge withdouble pylons, two cable planes and main span of 480m. The side span adopts concrete beam, whilethe remaining part of this bridge adopts steel box girder. Having two pylons of curved torch shape,streamline hollow steel box girder, and advanced collision protection structure for pylonfoundations, this bridge has several technical breakthroughs in cable-stayed bridge design.Zhanjiang Bay Bridge was commenced on July, 2003, completed and opened to traffic on December,2006; the total project cost is about CNY 1.25 billion.Several new technologies in terms of structural design, anti-collision of pylon, and healthmonitoring system of this bridge are introduced herein.
机译:湛江湾过境与广东省高速公路S373的连接是一个重要的问题。 跨过马克西海峡的桥梁。主桥是一座复合式斜拉桥,带有 双塔,两个电缆平面,主跨为480m。侧跨采用混凝土梁,而 这座桥的其余部分采用钢箱梁。有两个弯火炬形状的塔架, 流线型空心钢箱梁及先进的塔防撞结构 在此基础上,该桥在斜拉桥设计方面具有多项技术突破。 湛江湾跨海大桥于2003年7月动工,12月建成通车, 2006年;项目总成本约12.5亿元。 在结构设计,塔架防撞和健康方面的几种新技术 本文介绍了该桥的监控系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号