GREEN LANE GETS GREEN LIGHT: PARAMETER SENSITIVITY IN GRAVITY DAM STABILITY ANALYSIS

机译:绿道成绿灯:重力坝稳定性分析中的参数敏感性

获取原文

摘要

This paper includes a case history of the evaluations of Green Lane Dam, a 103-ft high concrete gravity dam constructed in the mid 1950s. In 2000, the Pennsylvania Department of Environmental Protection (PADEP), Division of Dam Safety expressed concerns regarding the dam's ability to safely pass the Probable Maximum Flood (PMF) based on current meteorologic and hydrologic criteria. Initial stability analyses of the structure indicated that the dam did not meet stability criteria under the increased PMF loading condition and would require strengthening. In 2004, Aqua Pennsylvania engaged Schnabel Engineering to provide subsurface investigations and preparation of design documents for a rock-anchoring program. The subsurface exploration, laboratory testing, detailed hydraulic analyses, and a thorough review of construction documents and photos indicated that the following factors significantly contributed to stability of the structure: 1. The unit weight of the concrete was higher than expected 2. Tailwater levels during the PMF were higher than assumed in previous analyses 3. The dam was "keyed" into the rock foundation Stability analyses incorporating these factors and considerations showed that the dam meets Army Corps of Engineers' criteria and that stabilization is not required. This paper focuses on the results of the field investigations and stability analyses, illustrates the significance of parameter selection in gravity dam stability analysis, and presents a dam safety story with a happy ending.
机译:本文介绍了Green Lane大坝评估的案例,Green Lane大坝是1950年代中期建造的103英尺高的混凝土重力坝。 2000年,宾夕法尼亚州环境保护局(PADEP)大坝安全司对大坝根据当前的气象和水文标准安全通过可能的最大洪水(PMF)的能力表示关注。结构的初步稳定性分析表明,在增加的PMF荷载条件下,大坝不符合稳定性标准,需要进行加固。 2004年,Aqua Pennsylvania聘请Schnabel Engineering为岩石锚固计划提供地下调查和设计文件的准备。地下勘探,实验室测试,详细的水力分析以及对施工文件和照片的彻底审查表明,以下因素显着影响了结构的稳定性:1.混凝土的单位重量比预期的要高。 PMF高于先前分析中的假设3。大坝被“锁定”在岩石地基中结合了这些因素和考虑因素的稳定性分析表明,该大坝符合陆军工程兵的标准,并且不需要进行稳定。本文着重于实地调查和稳定性分析的结果,阐明了参数选择在重力坝稳定性分析中的重要性,并提出了一个结局令人满意的大坝安全故事。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号